Yamaha 40V Manuel de service Page 165

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 224
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 164
7-18
BRKT
E
CLAMP BRACKET
REMOVAL AND INSTALLATION CHART
Step Procedure/Part name Q’ty Service points
CLAMP BRACKET REMOVAL
(Hydro tilt, Power trim and tilt)
Follow the left “Step” for removal.
Upper case ass’y Refer to “UPPER CASE REMOVAL”.
1 PTT motor lead 1 PTT model
2 Trim sensor coupler 1
3 Band 3 PTT motor lead - Trim sensor lead
4 Bolt (with washer) 1 6 × 10 mm
5 Wire lead 1
6 Bolt (with washer) 1 PTT model 6 × 10 mm
7 Wire lead 1
8 Grease nipple 1
9 Wire lead 1
10 Tilt rod ass’y 1
11 Nut 1
12 Plane washer 1
13 Stud bolt 1
14 Clamp bracket spacer ass’y 1
15 Nut 1
16 Cap 2
17 Self lock nut 1
18 Clamp bracket 2 1
19 Plane washer 1
20 Swivel bracket ass’y 1
21 Plane washer 1
22 Clamp bracket 1 1
23 Bushing 2
24 Clamp bracket bolt 1
25 Self lock nut 1
ANODE REMOVAL
1 Bolt (with washer) 1
2 Wire lead 1
3 Bolt (with washer) 1 PTT model
4 Wire lead 1
5 Anode 1
TRIM SENSOR REMOVAL
6 Band 1 PTT model
7 Screw 2 6 × 16 mm
8 Trim sensor 1
Reverse the removal steps for installation.
NOTE:
Before installing the clamp bracket bolt,
tighten the nut on its grooved side until it
stops.
Vue de la page 164
1 2 ... 160 161 162 163 164 165 166 167 168 169 170 ... 223 224

Commentaires sur ces manuels

Pas de commentaire