Yamaha MDX-9 Manuel de service Page 8

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 59
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 7
MDX-E100
MDX-E100
7
Removal of Mechanism SW P.C.B. (Fig.7)
Once the mechanism switch P.C.B. is removed, it will
be necessary to perform Adjustment of Lead-in Switch
Position. (See page 13.)
1. Remove 2 screws (E1) and then remove the Mecha-
nism SW P.C.B.
(E1)x1
Ø1.7x3mm
(E1)x1
Ø1.7x9.5mm
Fig.7
Fig. 8
Removal of Sled Motor/Loading Motor (Fig.8)
1. Remove 4 screws (D1) and then remove the sled
motor/loading motor.
(D1)x2
Ø1.7x2mm
(D1)x2
Ø1.7x2mm
Mechanism SW P.C.B.
Loading Motor
Sled motor
Caution
Use care so as not to cause any damage to the gear.
(The damaged gear will cause abnormal noise to occur
while searching.)
Installation of Mechanism SW P.C.B.
Set the mechanism to the eject mode by applying -5V
to the loading motor.
Install the Mechanism SW P.C.B. by aligning the hole
in the P.C.B. onto the guide-pin.
Push the lead switch on the Mechanism SW P.C.B.
toward the optical pickup side (so that looseness in the
guide-pin hole is eliminated).
Tighten screws and apply thread lock.
Measure the lead-in switch position. (See page 13.)
(Enter the result in EEPROM.)
Lead-in switch
Mechanism SW P.C.B.
(E1)x1
Ø1.7x9.5mm
(E1)x1
Ø1.7x3mm
Guide-pin
Vue de la page 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 58 59

Commentaires sur ces manuels

Pas de commentaire