Yamaha MDX-9 Manuel de service Page 7

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 59
  • Table des matières
  • DEPANNAGE
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 6
MDX-E100
MDX-E100
6
Removal of Cartridge Holder (Fig.6)
1. Open the roller arm lever in the arrow direction and move the clamper lever to the rear.
2. With a +5V voltage (*2) applied to the red line side of the blue connector of the loading
motor, push the rack gear in the arrow direction until the cam plate lever clicks.
(*2) A +5V voltage can be obtained from the positive lead (D6.5/5V) of C135 and the
ground terminal of the Main P.C.B.
3. Remove a screw (B1 and B2, 1 each) from the holder arm and remove the cartridge
holder by moving it to the left.
Slider Lever
Cartridge Holder
Clamper
Lever
Rack Gear
Roller Arm Lever
Loading
Motor
Cam Plate
Lever
(B1) x1
Ø1.7x5mm
(B2) x1
Fig.6
Caution
Be careful so that oil does not get on the clamper lever
which contacts the roller of the roller arm lever.
Installation of Cartridge Holder
To install the cartridge holder, the rack of the mechanism must be
lowered toward the rear.
While pushing the roller arm lever outward, push in the slider lever.
Apply a +5V to the loading motor (until a clicking sound is heard) and
push in the rack gear.
With the slider lever and the rack gear installed as described above,
fit the cartridge holder as shown in the figure and tighten the screws.
C135
Positive lead (D6.5/
5V)
Vue de la page 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 58 59

Commentaires sur ces manuels

Pas de commentaire